While solar is blooming fast in many other states now, California’s still the U.S. leader and continues to install solar at a rapid clip. There is actually hardly a country on earth with as much solar as is installed in California.
PV Solar Report, “an authority on California solar market data,” and SunRun, “the nation’s leading home solar company,” recently released a list* of the California cities growing the fastest in solar power installations. It’s a list, not much more than that, but who doesn’t love a list!
But here are some insights from SunRun and PV Solar Report on the rankings before revealing the list below:
“While steady solar growth continues in traditional solar hot beds like San Jose, new solar leaders like Hemet and Apple Valley indicate increasing solar adoption on a broader geographic scale. In addition, the majority of homeowners in these cities chose to go solar without buying the panels, known as solar power service.” (In other words, as reported many times here on CleanTechnica, solar leasing is popular… like it or not.)
“For example, top city San Jose had 648 homeowners choose solar service in 2011 versus 312 opting for panel purchase. In December 2011 solar power service was over 70% of the home solar market.”
SunRun is eager to note that it invented this solar option way back in 2007 and leads the market with about twice the market share of the next largest provider. But here are the really amazing statistics, in my opinion: “SunRun now installs over $1.5 million in solar every day, completing one rooftop installation every 11 minutes of the business day by letting American families switch to solar without spending $30,000 or more to buy panels.” Wow, $1.5 million/day, one rooftop every 11 minutes! Impressive.
Now, though, let’s get to the top 10 list!
San Jose
Bakersfield
Simi Valley
Lancaster
Fresno
Corona
Murrieta
Rocklin
Hemet
Apple Valley
*The list is “based on the California Solar Initiative’s (CSI) database of residential rebate reservations for calendar year 2011.”
SOURCE: http://cleantechnica.com/2012/02/09/10-fastest-growing-solar-cities-in-california/
Photovoltaics, or PV for short, is a Solar Power technology that uses Solar Photvoltaics systems' or Solar cells to provide electricity for human activities. Photovoltaics is also the field of study relating to this technology.
Thursday, March 1, 2012
Solar Subsidy Cuts Spark Job Fears
The Government has unveiled plans for further cuts to solar subsidies, sparking concerns over the future of the industry and thousands of clean-tech jobs.
Energy Minister Greg Barker claimed the reforms to payments for small-scale solar would mean a bigger scheme that could deliver an "extraordinarily ambitious" 22GW of panels - the equivalent of 3.3 million installations for homes and businesses.
He insisted the changes would mean that the payments tracked the falling costs of solar technology, delivering value for money for consumers who pay for the scheme on energy bills and preventing another "bubble" in the industry.
But campaigners said the proposals to cut subsidies further, announced as the Government said it was pressing ahead with plans to halve the payments, would leave the solar industry "dead in a ditch", putting thousands of jobs at risk.
Ministers have previously warned the falling costs of technology made the payments too generous, causing too rapid a take-up of solar panels. As a result, the feed-in tariffs scheme, which pays householders, organisations and businesses for electricity from small-scale renewables, has spiralled over budget.
The Department of Energy and Climate Change (Decc) revealed the popularity of solar panels meant the £1 billion budget for the current spending period had been blown, and £1.7 billion was already committed to payments.
Mr Barker said the solar industry should "get real" over subsidies, adding: "I fully expect the industry to expand this year, and continue to expand, but on a sustainable basis not in short bursts of temporary workers."
Under the proposals, the already-planned halving of solar payments for new installations from March - or from last December if the Government wins a Supreme Court challenge over the issue - will be followed by further cuts in July.
Decc said the overspend on the budget will be met by money from underspending on large-scale renewable subsidies, for example for offshore wind. Under the new plans the rate will also apply only to schemes with 25 or more sets of solar panels.
Howard Johns, spokesman for the Cut Don't Kill coalition of solar businesses and environmental campaigners, said: "The Government's initial cut to the tariff was brutal, and this further cut will be utterly devastating for the UK solar sector."
SOURCE: http://www.google.com/hostednews/ukpress/article/ALeqM5gtEwVCKVQ9EYfBjT0BieKZnj4w6A?docId=N0426311328785888997A
Energy Minister Greg Barker claimed the reforms to payments for small-scale solar would mean a bigger scheme that could deliver an "extraordinarily ambitious" 22GW of panels - the equivalent of 3.3 million installations for homes and businesses.
He insisted the changes would mean that the payments tracked the falling costs of solar technology, delivering value for money for consumers who pay for the scheme on energy bills and preventing another "bubble" in the industry.
But campaigners said the proposals to cut subsidies further, announced as the Government said it was pressing ahead with plans to halve the payments, would leave the solar industry "dead in a ditch", putting thousands of jobs at risk.
Ministers have previously warned the falling costs of technology made the payments too generous, causing too rapid a take-up of solar panels. As a result, the feed-in tariffs scheme, which pays householders, organisations and businesses for electricity from small-scale renewables, has spiralled over budget.
The Department of Energy and Climate Change (Decc) revealed the popularity of solar panels meant the £1 billion budget for the current spending period had been blown, and £1.7 billion was already committed to payments.
Mr Barker said the solar industry should "get real" over subsidies, adding: "I fully expect the industry to expand this year, and continue to expand, but on a sustainable basis not in short bursts of temporary workers."
Under the proposals, the already-planned halving of solar payments for new installations from March - or from last December if the Government wins a Supreme Court challenge over the issue - will be followed by further cuts in July.
Decc said the overspend on the budget will be met by money from underspending on large-scale renewable subsidies, for example for offshore wind. Under the new plans the rate will also apply only to schemes with 25 or more sets of solar panels.
Howard Johns, spokesman for the Cut Don't Kill coalition of solar businesses and environmental campaigners, said: "The Government's initial cut to the tariff was brutal, and this further cut will be utterly devastating for the UK solar sector."
SOURCE: http://www.google.com/hostednews/ukpress/article/ALeqM5gtEwVCKVQ9EYfBjT0BieKZnj4w6A?docId=N0426311328785888997A
Labels:
Solar Rebates
ESA Renewables Receives Approval from Tennessee Valley Authority for 22 Solar Arrays
Turnkey solar solutions provider given thumbs up for multiple 200kW photovoltaic systems in Tennessee and North Carolina
Hayesville, NC, March 1, 2012 – ESARenewables (ESA), a leading turnkey solar solutions provider, confirmed the acceptance of 22 Participation Agreements for customer-sited projects through the Tennessee Valley Authority (TVA) and the local co-ops in the North Carolina and Tennessee areas.
During the fall of 2011, ESA submitted the applications to TVA's Generation Partners pilot program. The pilot was designed to demonstrate the feasibility of purchasing electric energy from residential, commercial, and industrial customers generated by qualified renewable generation resources. Qualifying systems were required to be more than .5 kilowatt (kW), but less than 200kW and consist of a commercially proven technology of either, solar electric, wind, low-impact hydropower or biomass. Since that time, the program has been modified for projects up to 50kW.
All 22 applications for the customer-sited projects being installed by ESA have been accepted to participate in the TVA Generation Partners pilot program. According to the terms of the pilot, the systems must be completed and commissioned within six months of the acceptance date.
ESA will engineer and install the 200kW DC photovoltaic solar arrays on each of the sites, as well as operate and maintain the sites for the duration of the agreement term. Each property owner has entered into a lease agreement for the property being utilized that allows them additional income for the duration of the contract.
"ESA is pleased to learn of TVA’s approval of these 22 applications," said Jeffrey Burkett, President of ESA Renewables. "These solar arrays will be of great financial benefit to the customers, and further advance our countries efforts towards generating clean, green energy."
About ESA Renewables, LLC
ESA Renewables has positioned itself as a leader in the industry providing turnkey solar PV systems globally. ESA owns and operates a diverse portfolio of more than 500 solar PV power generating facilities located in the United States, Puerto Rico, Spain and Italy. ESA’s scope of services includes financing, engineering, construction, testing and operation and maintenance. With headquarters in Castellon Spain, ESA has additional offices in Florida, North Carolina, Puerto Rico, France and Italy. For more information about ESA Renewables, LLC, please visit http://www.esarenewables.com or call 407-268-6455.
Labels:
Solar News
Wednesday, February 29, 2012
Problems Cast Shadows of Doubt on Solar Project
One of California's showcase solar energy projects, under construction in the desert east of Los Angeles, is being threatened by a deadly outbreak of distemper among kit foxes and the discovery of a prehistoric human settlement on the work site.
The $1 billion Genesis Solar Energy Project has been expedited by state and federal regulatory agencies that are eager to demonstrate that the nation can build solar plants quickly to ease dependence on fossil fuels and curb global warming.
Instead, the project is providing a cautionary example of how the rush to harness solar power in the desert can go wrong _ possibly costing taxpayers hundreds of millions of dollars and dealing an embarrassing blow to the Obama administration's solar initiative.
Genesis had hoped to be among the first of 12 approved solar farms to start operating in Southern California deserts. To do so, it had to meet certain deadlines to receive federal assistance. The 250-megwatt plant, being built on federal Bureau of Land Management land 25 miles west of Blythe, is backed by an $825 million Department of Energy loan guarantee.
Native Americans, including the leaders of a nearby reservation, are trying to have Genesis delayed or even scuttled because they say the distemper outbreak and discovery of a possible Native American cremation site show that accelerated procedures approved by state and federal regulators failed to protect wildlife and irreplaceable cultural resources.
The problems threaten the entire project, said Michael O'Sullivan, senior vice president of development for Florida-based NextEra Energy Resources, one of the largest renewable energy suppliers in North America and the builder of Genesis. The project is to start producing power by 2014. If too many acres are deemed off-limits to construction, "the project could become uneconomical," O'Sullivan said.
Plans for Genesis call for parabolic-trough solar thermal technology to create enough energy to power 187,500 homes. But last fall, as crews began installing pylons and support arms for parabolic mirrors across 1,950 acres of land leveled by earthmovers, the company ran into unexpected environmental and cultural obstacles _ the kind that critics say could probably have been avoided by more rigorous research and planning.
"The issues facing Genesis underline the notion that if you do something quick and dirty, you are going to wind up with big mistakes and unintended consequences," said Lisa Belenky, senior attorney for the Center for Biological Diversity.
Kit foxes became an issue at the site in late August, when two animals died. At the time, biologists assumed the foxes succumbed to dehydration in an area where summer temperatures soar to 118 degrees. On Oct. 5, Genesis crews discovered another fox carcass and sent it to state Fish and Game veterinarians for a necropsy.
At the time, the company was using "passive hazing" strategies approved by state and federal biologists to force kit foxes off the land before grading operations began in November. To scatter the kit foxes, workers removed sources of food and cover, sprinkled urine from coyotes _ a primary fox predator _ around den entrances, and used shovels and axes to excavate about 20 dens that had been unoccupied for at least three consecutive days.
By early November, only three active dens remained, but the foxes using them wouldn't budge, raising the risk of construction delays. The California Energy Commission, which has jurisdiction over the project, scrapped the three-day timetable and said the company could destroy dens that had been vacant for 24 hours.
Five days after making that change, the results of the necropsy came back. The fox found Oct. 5 had died of the first case of distemper ever recorded among desert kit foxes. Ultimately, at least seven kit foxes died.
Deana Clifford, state wildlife veterinarian for the California Department of Fish and Game, said she isn't certain the outbreak is connected to Genesis, "but we know that habitat disturbance causes stress, and when animals succumb to stress they become more susceptible to disease."
State and federal biologists are now trying to prevent the disease from spreading beyond the site. To discourage displaced kit foxes from re-entering the area, electric wires have been installed along the top of waist-high fences originally intended to keep desert tortoises relocated by NextEra from trying to return to their former burrows.
Evidence of a human settlement is of even greater concern to the company. Earthmovers on Nov. 17 churned up grinding stones lying on a bed of charcoal _ possible evidence of an ancient cremation site. In a subsequent meeting with Colorado River Indian Tribes, a federally recognized reservation just east of the work site, Bureau of Land Management officials described the discovery as "unprecedented," tribal leaders said.
The remains are protected by the federal Native American Graves Protection and Repatriation Act. Work has been halted on 400 acres, or one-fifth of the project's total area, while state and federal archaeologists conduct a detailed assessment.
The discovery did not come as a complete surprise. In 2010 testimony before the state energy commission, archaeologist David S. Whitley warned that Ford Dry Lake, at the southern end of the Genesis site, had been a gathering place for prehistoric people who cremated their dead. Based on surface evidence, at least three locations within the Genesis project area appeared "to represent lake shore village sites that have the potential to contain burials/cemeteries," Whitley said.
To avoid the old lake shore area, NextEra reconfigured the project, moving it about two miles north.
However, the company did not follow customary methods for searching the new site for human remains. Instead of using established but costly and time-consuming procedures, NextEra opted for a new, less exacting search method developed by the state energy commission and the BLM to expedite Genesis and three other desert solar projects.
The energy commission outlined the new method in a Dec. 3, 2009, letter that included a warning: If the search found nothing, but artifacts were discovered later, during construction, the project could be suspended while an exhaustive investigation was performed.
That's what happened. NextEra's search involved digging more than 500 shovel test pits each up to 3 feet deep. It found nothing.
Now the Colorado River Indian Tribes reservation is demanding that NextEra halt construction until its own experts can investigate. Eldred Enas, chairman of the Colorado River Indian Tribes, said in a letter to the federal government last month that the discovery of a nestled pair of metates _ stones used to grind acorns, pinion nuts and other staples _ atop a bed of charcoal indicates that it was a cremation site that is "too sacred to disturb."
Separately, a nearby group of Native Americans called La Cuna de Aztlan Sacred Sites Protection Circle is preparing a legal challenge based on the kit foxes and the possible cremation site. Cory Briggs, an attorney representing La Cuna Aztlan, said NextEra received an early warning: "This is the wrong place to build. Instead, they put their foot on the gas pedal in order to get this thing approved and deal with problems later."
The company and regulatory agencies are studying options, which could range from avoiding locations known to contain significant Native American remains to a formal archaeological excavation.
In an interview, NextEra officials acknowledged that in a worst-case scenario, they could decide that they cannot meet the conditions of the company's power purchase agreement with Pacific Gas & Electric Co. and close down a project that is expected to create 800 construction jobs.
If that were to happen, 80 percent of the project's outstanding loans would be covered by the federal government, and the U.S. Bureau of Land Management would begin shopping for another renewable energy company that was interested in leasing the property. If there were no takers, the scarred land would be restored with reclamation bond funds, BLM officials said.
Looking ahead, Roger Johnson, deputy director of siting with the state energy commission, said lessons learned from the Genesis project will be included in other high-priority solar facilities.
Jeffrey Lovich, a research ecologist with the U.S. Geological Survey, said the challenges facing NextEra are messy reminders of the fact that "peer-reviewed scientific studies to help us tease out the impacts of solar energy development" on the California desert do not exist.
"So there will be very likely be additional surprises as we move forward," Lovich said.
SOURCE: http://www.oregonlive.com/newsflash/index.ssf/story/problems-cast-shadows-of-doubt-on-solar/d323e9787dee20e994f66b495a48100b
The $1 billion Genesis Solar Energy Project has been expedited by state and federal regulatory agencies that are eager to demonstrate that the nation can build solar plants quickly to ease dependence on fossil fuels and curb global warming.
Instead, the project is providing a cautionary example of how the rush to harness solar power in the desert can go wrong _ possibly costing taxpayers hundreds of millions of dollars and dealing an embarrassing blow to the Obama administration's solar initiative.
Genesis had hoped to be among the first of 12 approved solar farms to start operating in Southern California deserts. To do so, it had to meet certain deadlines to receive federal assistance. The 250-megwatt plant, being built on federal Bureau of Land Management land 25 miles west of Blythe, is backed by an $825 million Department of Energy loan guarantee.
Native Americans, including the leaders of a nearby reservation, are trying to have Genesis delayed or even scuttled because they say the distemper outbreak and discovery of a possible Native American cremation site show that accelerated procedures approved by state and federal regulators failed to protect wildlife and irreplaceable cultural resources.
The problems threaten the entire project, said Michael O'Sullivan, senior vice president of development for Florida-based NextEra Energy Resources, one of the largest renewable energy suppliers in North America and the builder of Genesis. The project is to start producing power by 2014. If too many acres are deemed off-limits to construction, "the project could become uneconomical," O'Sullivan said.
Plans for Genesis call for parabolic-trough solar thermal technology to create enough energy to power 187,500 homes. But last fall, as crews began installing pylons and support arms for parabolic mirrors across 1,950 acres of land leveled by earthmovers, the company ran into unexpected environmental and cultural obstacles _ the kind that critics say could probably have been avoided by more rigorous research and planning.
"The issues facing Genesis underline the notion that if you do something quick and dirty, you are going to wind up with big mistakes and unintended consequences," said Lisa Belenky, senior attorney for the Center for Biological Diversity.
Kit foxes became an issue at the site in late August, when two animals died. At the time, biologists assumed the foxes succumbed to dehydration in an area where summer temperatures soar to 118 degrees. On Oct. 5, Genesis crews discovered another fox carcass and sent it to state Fish and Game veterinarians for a necropsy.
At the time, the company was using "passive hazing" strategies approved by state and federal biologists to force kit foxes off the land before grading operations began in November. To scatter the kit foxes, workers removed sources of food and cover, sprinkled urine from coyotes _ a primary fox predator _ around den entrances, and used shovels and axes to excavate about 20 dens that had been unoccupied for at least three consecutive days.
By early November, only three active dens remained, but the foxes using them wouldn't budge, raising the risk of construction delays. The California Energy Commission, which has jurisdiction over the project, scrapped the three-day timetable and said the company could destroy dens that had been vacant for 24 hours.
Five days after making that change, the results of the necropsy came back. The fox found Oct. 5 had died of the first case of distemper ever recorded among desert kit foxes. Ultimately, at least seven kit foxes died.
Deana Clifford, state wildlife veterinarian for the California Department of Fish and Game, said she isn't certain the outbreak is connected to Genesis, "but we know that habitat disturbance causes stress, and when animals succumb to stress they become more susceptible to disease."
State and federal biologists are now trying to prevent the disease from spreading beyond the site. To discourage displaced kit foxes from re-entering the area, electric wires have been installed along the top of waist-high fences originally intended to keep desert tortoises relocated by NextEra from trying to return to their former burrows.
Evidence of a human settlement is of even greater concern to the company. Earthmovers on Nov. 17 churned up grinding stones lying on a bed of charcoal _ possible evidence of an ancient cremation site. In a subsequent meeting with Colorado River Indian Tribes, a federally recognized reservation just east of the work site, Bureau of Land Management officials described the discovery as "unprecedented," tribal leaders said.
The remains are protected by the federal Native American Graves Protection and Repatriation Act. Work has been halted on 400 acres, or one-fifth of the project's total area, while state and federal archaeologists conduct a detailed assessment.
The discovery did not come as a complete surprise. In 2010 testimony before the state energy commission, archaeologist David S. Whitley warned that Ford Dry Lake, at the southern end of the Genesis site, had been a gathering place for prehistoric people who cremated their dead. Based on surface evidence, at least three locations within the Genesis project area appeared "to represent lake shore village sites that have the potential to contain burials/cemeteries," Whitley said.
To avoid the old lake shore area, NextEra reconfigured the project, moving it about two miles north.
However, the company did not follow customary methods for searching the new site for human remains. Instead of using established but costly and time-consuming procedures, NextEra opted for a new, less exacting search method developed by the state energy commission and the BLM to expedite Genesis and three other desert solar projects.
The energy commission outlined the new method in a Dec. 3, 2009, letter that included a warning: If the search found nothing, but artifacts were discovered later, during construction, the project could be suspended while an exhaustive investigation was performed.
That's what happened. NextEra's search involved digging more than 500 shovel test pits each up to 3 feet deep. It found nothing.
Now the Colorado River Indian Tribes reservation is demanding that NextEra halt construction until its own experts can investigate. Eldred Enas, chairman of the Colorado River Indian Tribes, said in a letter to the federal government last month that the discovery of a nestled pair of metates _ stones used to grind acorns, pinion nuts and other staples _ atop a bed of charcoal indicates that it was a cremation site that is "too sacred to disturb."
Separately, a nearby group of Native Americans called La Cuna de Aztlan Sacred Sites Protection Circle is preparing a legal challenge based on the kit foxes and the possible cremation site. Cory Briggs, an attorney representing La Cuna Aztlan, said NextEra received an early warning: "This is the wrong place to build. Instead, they put their foot on the gas pedal in order to get this thing approved and deal with problems later."
The company and regulatory agencies are studying options, which could range from avoiding locations known to contain significant Native American remains to a formal archaeological excavation.
In an interview, NextEra officials acknowledged that in a worst-case scenario, they could decide that they cannot meet the conditions of the company's power purchase agreement with Pacific Gas & Electric Co. and close down a project that is expected to create 800 construction jobs.
If that were to happen, 80 percent of the project's outstanding loans would be covered by the federal government, and the U.S. Bureau of Land Management would begin shopping for another renewable energy company that was interested in leasing the property. If there were no takers, the scarred land would be restored with reclamation bond funds, BLM officials said.
Looking ahead, Roger Johnson, deputy director of siting with the state energy commission, said lessons learned from the Genesis project will be included in other high-priority solar facilities.
Jeffrey Lovich, a research ecologist with the U.S. Geological Survey, said the challenges facing NextEra are messy reminders of the fact that "peer-reviewed scientific studies to help us tease out the impacts of solar energy development" on the California desert do not exist.
"So there will be very likely be additional surprises as we move forward," Lovich said.
SOURCE: http://www.oregonlive.com/newsflash/index.ssf/story/problems-cast-shadows-of-doubt-on-solar/d323e9787dee20e994f66b495a48100b
Labels:
Solar News
China’s Visible Solar Power Success
Suntech Power’s ebullient Chief Executive Officer Shi Zhengrong got plenty of press at Davos for his proclamation that solar power will be able to compete without subsidies against conventional power sources in half the world by 2015.
Shi said that solar is already competitive with fossil fuels in India, Hawaii, Italy and Spain. Others at the alpine power-fest agreed with Shi, who runs one of the world’s largest and most important solar panel manufacturers. The head of the world’s largest wind company, Vestas, as well as another Chinese solar panel producer, Trina, both said that their companies would also be able to offer products that produce electricity at prices that matched fossil fuels.
We are at a tipping point. No longer are renewable power sources like solar and wind a luxury of the rich. They are now starting to compete in the real world without subsidies. Fossil fuels are not going away. But we can at least look forward to a world where our dependence on fossil fuels will decline.
The waning of the age of fossil fuels is good news for many reasons: the air will be cleaner and greenhouse gas emissions will be cut; and energy security will be improved, meaning that nations won’t have to worry about transporting fossil fuels long distances — often from foreign countries. Within the foreseeable future, a world where political upheavals or natural calamities could threaten supplies could be a thing of the past. With the right policies in place, many parts of the world over the next decade can look forward to dramatically cutting their dependence on fossil fuels.
But how fast this transition takes place depends not only on the technological and market savvy of entrepreneurs like Shi but on smart, forward-thinking government policies.
Only a few years ago it cost more than twice as much to produce electricity with solar panels than through conventional sources such as coal-fired power plants. Dramatic improvements in technology coupled with plummeting prices for polysilicon, a key ingredient, and big increases in solar panel manufacturing capacity have pushed down prices. Bloomberg says that silicon-based panel prices fell about half last year as silicon makers doubled their output and demand fell in a weakened Eurozone.
China, not surprisingly, has staked out a commanding position in solar panel manufacturing. China now accounts for about half of the world’s solar panel and module production. The U.S. which in 1995 produced more than 40% of the world’s panels, accounted for only 7% of global output in 2010.
U.S. solar panel manufacturers have cried foul and in late 2011 they filed an anti-dumping lawsuit against Chinese manufacturers claiming that a variety of Chinese subsidies are allowing the Chinese to sell solar panels in the U.S. below their true cost of production. The U.S. International Trade Commission, which rules on these disputes, agreed in December that the case could go ahead.
The resulting uncertainty will likely slow the progress of solar sales in the U.S. market, but won’t fundamentally change an extraordinary story of unfolding Chinese success in winning market share and driving down prices in an area of profound significance for the future of the world. We’re not talking iPads or running shoes here, but the ability to create electricity from the sun in a way that promises virtually limitless supplies of light and heat without air pollution or greenhouse gas emissions. And, thanks to Shi Zhengrong and many others, we can install solar not just for the rich.
China isn’t just a maker of solar power — it now is one of the largest and most important markets for renewable energy. China was behind much of the spectacular 165% growth in Asia-Pacific’s solar installations, according to market researcher NPD Solarbuzz, with Chinese 2011 demand up six-fold from the previous year. China increased its targets for total solar power installation to 15 gigawatts by 2015. That’s up from just one gigawatt at the end of 2010. Targets for installed wind capacity were increased to 100 gigawatts by 2015. These are big numbers.
More money will be on the way to support more technological improvements. China and the U.S. are global leaders in clean-tech spending.
“Countries around the world, especially China, recognize the economic potential in the solar market, and are racing at full speed to capture the lead,” U.S. Energy Secretary Steven Chu warned in a recent speech. “America has a choice to make today: Are we going to be importers or exporters of solar technologies? We can accept defeat and watch the solar jobs go to China, Germany and other countries, or we can get in the game and play to win, creating jobs ….across the country.”
Underscoring Chu’s remarks about the importance of the sector, a new report from consultants PwC says that the value of deals in the renewable energy sector jumped 40% to $53.5 billion last year (2011). PwC notes that in the past hydro-power typically dominated the list of big-ticket transactions in the renewables sector. But “big deals are becoming more common in the wind, solar, biomass and energy efficiency fields,” notes PwC. “For the first time ever, $1 billion-plus deals in these four sectors dominate the list of top deals, outnumbering hydro by seven to one as contributors to big deal flow.”
In short, solar power, and its renewable cousins like wind, are coming of age. Profitability may be elusive and trade battles may intensify, but the overall outlook for solar as a power source has never been brighter. The improved efficiency and lower prices for solar power will benefit a broad range of consumers, from affluent urbanites for whom a solar panel is a novelty to impoverished rural dwellers who can enjoy hot water and lighting. The benefits are not just to individual quality of life but to national security and to a world in which energy policy does not drive foreign policy.
There will be a long march to phase out fossil fuels, starting with the more than $500 billion in annual subsidies they receive globally. But the renewable path is becoming more certain and secure with every passing year. China and the U.S. are competitors in this area. They are also both winners. As trade disputes intensify it’s important to remember that winners will far outnumber losers as the price of renewable energy falls.
SOURCE: http://www.marketwatch.com/story/chinas-visible-solar-power-success-2012-02-08
Shi said that solar is already competitive with fossil fuels in India, Hawaii, Italy and Spain. Others at the alpine power-fest agreed with Shi, who runs one of the world’s largest and most important solar panel manufacturers. The head of the world’s largest wind company, Vestas, as well as another Chinese solar panel producer, Trina, both said that their companies would also be able to offer products that produce electricity at prices that matched fossil fuels.
We are at a tipping point. No longer are renewable power sources like solar and wind a luxury of the rich. They are now starting to compete in the real world without subsidies. Fossil fuels are not going away. But we can at least look forward to a world where our dependence on fossil fuels will decline.
The waning of the age of fossil fuels is good news for many reasons: the air will be cleaner and greenhouse gas emissions will be cut; and energy security will be improved, meaning that nations won’t have to worry about transporting fossil fuels long distances — often from foreign countries. Within the foreseeable future, a world where political upheavals or natural calamities could threaten supplies could be a thing of the past. With the right policies in place, many parts of the world over the next decade can look forward to dramatically cutting their dependence on fossil fuels.
But how fast this transition takes place depends not only on the technological and market savvy of entrepreneurs like Shi but on smart, forward-thinking government policies.
Only a few years ago it cost more than twice as much to produce electricity with solar panels than through conventional sources such as coal-fired power plants. Dramatic improvements in technology coupled with plummeting prices for polysilicon, a key ingredient, and big increases in solar panel manufacturing capacity have pushed down prices. Bloomberg says that silicon-based panel prices fell about half last year as silicon makers doubled their output and demand fell in a weakened Eurozone.
China, not surprisingly, has staked out a commanding position in solar panel manufacturing. China now accounts for about half of the world’s solar panel and module production. The U.S. which in 1995 produced more than 40% of the world’s panels, accounted for only 7% of global output in 2010.
U.S. solar panel manufacturers have cried foul and in late 2011 they filed an anti-dumping lawsuit against Chinese manufacturers claiming that a variety of Chinese subsidies are allowing the Chinese to sell solar panels in the U.S. below their true cost of production. The U.S. International Trade Commission, which rules on these disputes, agreed in December that the case could go ahead.
The resulting uncertainty will likely slow the progress of solar sales in the U.S. market, but won’t fundamentally change an extraordinary story of unfolding Chinese success in winning market share and driving down prices in an area of profound significance for the future of the world. We’re not talking iPads or running shoes here, but the ability to create electricity from the sun in a way that promises virtually limitless supplies of light and heat without air pollution or greenhouse gas emissions. And, thanks to Shi Zhengrong and many others, we can install solar not just for the rich.
China isn’t just a maker of solar power — it now is one of the largest and most important markets for renewable energy. China was behind much of the spectacular 165% growth in Asia-Pacific’s solar installations, according to market researcher NPD Solarbuzz, with Chinese 2011 demand up six-fold from the previous year. China increased its targets for total solar power installation to 15 gigawatts by 2015. That’s up from just one gigawatt at the end of 2010. Targets for installed wind capacity were increased to 100 gigawatts by 2015. These are big numbers.
More money will be on the way to support more technological improvements. China and the U.S. are global leaders in clean-tech spending.
“Countries around the world, especially China, recognize the economic potential in the solar market, and are racing at full speed to capture the lead,” U.S. Energy Secretary Steven Chu warned in a recent speech. “America has a choice to make today: Are we going to be importers or exporters of solar technologies? We can accept defeat and watch the solar jobs go to China, Germany and other countries, or we can get in the game and play to win, creating jobs ….across the country.”
Underscoring Chu’s remarks about the importance of the sector, a new report from consultants PwC says that the value of deals in the renewable energy sector jumped 40% to $53.5 billion last year (2011). PwC notes that in the past hydro-power typically dominated the list of big-ticket transactions in the renewables sector. But “big deals are becoming more common in the wind, solar, biomass and energy efficiency fields,” notes PwC. “For the first time ever, $1 billion-plus deals in these four sectors dominate the list of top deals, outnumbering hydro by seven to one as contributors to big deal flow.”
In short, solar power, and its renewable cousins like wind, are coming of age. Profitability may be elusive and trade battles may intensify, but the overall outlook for solar as a power source has never been brighter. The improved efficiency and lower prices for solar power will benefit a broad range of consumers, from affluent urbanites for whom a solar panel is a novelty to impoverished rural dwellers who can enjoy hot water and lighting. The benefits are not just to individual quality of life but to national security and to a world in which energy policy does not drive foreign policy.
There will be a long march to phase out fossil fuels, starting with the more than $500 billion in annual subsidies they receive globally. But the renewable path is becoming more certain and secure with every passing year. China and the U.S. are competitors in this area. They are also both winners. As trade disputes intensify it’s important to remember that winners will far outnumber losers as the price of renewable energy falls.
SOURCE: http://www.marketwatch.com/story/chinas-visible-solar-power-success-2012-02-08
Labels:
Solar News
ENERGY: Uncertainty Clouds Obama’s Latest Solar Push
President Barack Obama wants to revive the renewable energy push that fostered a solar development boom in the first years of his administration, particularly across the sun-drenched deserts of Riverside and San Bernardino counties.
But clouding his effort is the expiration of federal programs meant to spur investment, a backlash against the White House’s policies in the wake of the Solyndra debacle, and unresolved questions about where large-scale plants can be built.
“The biggest challenge for the industry comes around the uncertainty,” said Jim Baak, director of utility-scale solar power for Vote Solar, a San Francisco-based nonprofit that promotes clean energy. “In the political reality, it’s kind of hard to get that certainty moving forward.”
In his State of the Union address last month, Obama said the time has come to “double-down on a clean energy industry that never has been more promising.”
He announced plans to free up enough public land for solar and wind energy development sufficient to power 3 million homes, and he called on Congress to pass incentives to bolster the burgeoning industry.
His remarks, however, came after the clock ran out on two such incentives that brought billions of dollars to solar developments in Riverside and San Bernardino counties and the Southwest.
GRANTS LAPSE
Solar projects have for years enjoyed federal support, including an investment tax credit which runs through 2016. The credit can cover as much as 30 percent of costs, but only profitable projects can take advantage of it. Since start-ups cannot generate enough money to do so, they rely on investment partners with enough income to benefit from the credit.
The Great Recession led to a shortage of such investors, who had become a major driver of solar development. Responding to concerns about the downturn’s impact on the industry at large, Congress in 2009 approved a Treasury Department grant program that allows projects and their investors to get a direct grant in lieu of the 30 percent tax credit.
As of late last year, the treasury had issued about $9.6 billion in grants to more than 22,000 small and large projects, helping to leverage $32.9 billion in investment — mostly from the private sector, according to Treasury Department figures.
Despite its popularity, the grant program was allowed to expire at the end of last year. Proponents are calling on Congress to restart it, potentially through language attached to a payroll tax cut extension lawmakers are expected to take up in the coming weeks.
The grants were an alternative to the tax credits, so it wouldn’t cost the government additional money to keep offering the grants, officials from BrightSource Energy reasoned. The Oakland-based company has one project under construction in San Bernardino County and three others in the region still in early stages.
The grant program’s expiration limits the private sector’s willingness and ability to invest in solar, they said.
“For California, it negatively impacts billions of private-sector investment that otherwise could go to work for the benefit of our citizens,” BrightSource spokesman Keely Wachs said.
A 3,600-acre BrightSource project in the Ivanpah Valley in northeast San Bernardino County was among four Inland solar developments to benefit from a separate federal program, administered by the Energy Department. The Ivanpah solar farm, supported by investments from Google and NRG Energy, has created hundreds of jobs and is expected to supply enough energy to power 140,000 homes.
LOANS SCRUTINIZED
The Energy Department’s loan guarantee program, also created by Obama’s 2009 Recovery Act, helped finance at least two dozen projects through guarantees totaling more than $16 billion. More than $5 billion in guarantees went to the four projects located in Riverside and San Bernardino counties. The guarantee means that if a company defaults on a loan, the federal government pays the debt.
In the Solyndra case, that promise cost U.S. taxpayers $535 million.
The now infamous Fremont-based company filed for bankruptcy soon after receiving the money. Critics seized on the Solyndra scandal as evidence that the administration’s renewable energy policies are misguided.
The program was allowed to end as scheduled last fall, but the Solyndra fallout continues. Inland Rep. Darrell Issa, chairman of the House Oversight Committee, is conducting an investigation into the Energy Department’s loan decisions.
Earlier this month, Issa sent a letter to Energy Secretary Steven Chu, threatening to subpoena his testimony on the subject if he does not appear before the panel, as previously requested.
“The American people have a right to know why DOE, under your leadership, has wasted billions of dollars of their money,” wrote Issa, who represents a large chunk of Riverside County.
Baak said the negative attention sparked by Solyndra has contributed to the current political climate — one in which re-starting the expired programs would be difficult.
“It’s unfortunate that it’s been such a lightning rod,” he said, noting Solyndra reflects only a small fraction of the program.
One project in Riverside County gave up a loan guarantee when the company changed the technology it planned to use. Others are proceeding as planned.
Among the projects that received loan guarantees was Desert Sunlight, a First Solar development near Desert Center. The government backed more than $1 billion of the loan the company obtained for the project. Other companies that have loan guarantees are Next Era Energy Resources, for a project near Blythe, and Abengoa, for a solar field near Barstow.
An independent consultant hired by the White House to review the agency’s loans issued a report Friday calling for stronger management and an “early warning” system to identify problems with individual loans.
SOLAR ZONES
Despite the setbacks, solar projects are moving forward. But progress is slow in designating solar zones that would eliminate some of the bureaucratic hurdles facing developers.
The Interior and Energy departments are reviewing thousands of public comments collected as part of an ongoing effort to create “solar energy zones” for development on public land. A draft proposal identified 17 zones totaling more that 285,000 acres. More than half of the total — almost 150,000 acres — is in a single zone in eastern Riverside County.
While some environmental concerns remain, there is consensus that the zones will help shape the nation’s future in solar energy. Federal officials began gathering public input more than a year ago, but a final decision on their size and location is not expected for several months.
Baak said the process has meant uncertainty in the short term but will help advance solar growth in the long run. In the meantime, he and other solar proponents say the public is behind them.
A poll, underwritten by BrightSource to assess community support, found that three-quarters of those surveyed support large-scale solar development in California’s desert.
“It shows that a lot of people support this,” he said. “People recognize that this is a homegrown resource and something that’s going to create new jobs.”
SOURCE: http://www.pe.com/local-news/politics/ben-goad-headlines/20120211-energy-uncertainty-clouds-obamas-latest-solar-push.ece
![]() |
| Wire mesh is wrapped around posts, so birds will not nest in them |
But clouding his effort is the expiration of federal programs meant to spur investment, a backlash against the White House’s policies in the wake of the Solyndra debacle, and unresolved questions about where large-scale plants can be built.
“The biggest challenge for the industry comes around the uncertainty,” said Jim Baak, director of utility-scale solar power for Vote Solar, a San Francisco-based nonprofit that promotes clean energy. “In the political reality, it’s kind of hard to get that certainty moving forward.”
In his State of the Union address last month, Obama said the time has come to “double-down on a clean energy industry that never has been more promising.”
He announced plans to free up enough public land for solar and wind energy development sufficient to power 3 million homes, and he called on Congress to pass incentives to bolster the burgeoning industry.
His remarks, however, came after the clock ran out on two such incentives that brought billions of dollars to solar developments in Riverside and San Bernardino counties and the Southwest.
GRANTS LAPSE
Solar projects have for years enjoyed federal support, including an investment tax credit which runs through 2016. The credit can cover as much as 30 percent of costs, but only profitable projects can take advantage of it. Since start-ups cannot generate enough money to do so, they rely on investment partners with enough income to benefit from the credit.
The Great Recession led to a shortage of such investors, who had become a major driver of solar development. Responding to concerns about the downturn’s impact on the industry at large, Congress in 2009 approved a Treasury Department grant program that allows projects and their investors to get a direct grant in lieu of the 30 percent tax credit.
As of late last year, the treasury had issued about $9.6 billion in grants to more than 22,000 small and large projects, helping to leverage $32.9 billion in investment — mostly from the private sector, according to Treasury Department figures.
Despite its popularity, the grant program was allowed to expire at the end of last year. Proponents are calling on Congress to restart it, potentially through language attached to a payroll tax cut extension lawmakers are expected to take up in the coming weeks.
The grants were an alternative to the tax credits, so it wouldn’t cost the government additional money to keep offering the grants, officials from BrightSource Energy reasoned. The Oakland-based company has one project under construction in San Bernardino County and three others in the region still in early stages.
The grant program’s expiration limits the private sector’s willingness and ability to invest in solar, they said.
“For California, it negatively impacts billions of private-sector investment that otherwise could go to work for the benefit of our citizens,” BrightSource spokesman Keely Wachs said.
A 3,600-acre BrightSource project in the Ivanpah Valley in northeast San Bernardino County was among four Inland solar developments to benefit from a separate federal program, administered by the Energy Department. The Ivanpah solar farm, supported by investments from Google and NRG Energy, has created hundreds of jobs and is expected to supply enough energy to power 140,000 homes.
LOANS SCRUTINIZED
The Energy Department’s loan guarantee program, also created by Obama’s 2009 Recovery Act, helped finance at least two dozen projects through guarantees totaling more than $16 billion. More than $5 billion in guarantees went to the four projects located in Riverside and San Bernardino counties. The guarantee means that if a company defaults on a loan, the federal government pays the debt.
In the Solyndra case, that promise cost U.S. taxpayers $535 million.
The now infamous Fremont-based company filed for bankruptcy soon after receiving the money. Critics seized on the Solyndra scandal as evidence that the administration’s renewable energy policies are misguided.
The program was allowed to end as scheduled last fall, but the Solyndra fallout continues. Inland Rep. Darrell Issa, chairman of the House Oversight Committee, is conducting an investigation into the Energy Department’s loan decisions.
Earlier this month, Issa sent a letter to Energy Secretary Steven Chu, threatening to subpoena his testimony on the subject if he does not appear before the panel, as previously requested.
“The American people have a right to know why DOE, under your leadership, has wasted billions of dollars of their money,” wrote Issa, who represents a large chunk of Riverside County.
Baak said the negative attention sparked by Solyndra has contributed to the current political climate — one in which re-starting the expired programs would be difficult.
“It’s unfortunate that it’s been such a lightning rod,” he said, noting Solyndra reflects only a small fraction of the program.
One project in Riverside County gave up a loan guarantee when the company changed the technology it planned to use. Others are proceeding as planned.
Among the projects that received loan guarantees was Desert Sunlight, a First Solar development near Desert Center. The government backed more than $1 billion of the loan the company obtained for the project. Other companies that have loan guarantees are Next Era Energy Resources, for a project near Blythe, and Abengoa, for a solar field near Barstow.
An independent consultant hired by the White House to review the agency’s loans issued a report Friday calling for stronger management and an “early warning” system to identify problems with individual loans.
SOLAR ZONES
Despite the setbacks, solar projects are moving forward. But progress is slow in designating solar zones that would eliminate some of the bureaucratic hurdles facing developers.
The Interior and Energy departments are reviewing thousands of public comments collected as part of an ongoing effort to create “solar energy zones” for development on public land. A draft proposal identified 17 zones totaling more that 285,000 acres. More than half of the total — almost 150,000 acres — is in a single zone in eastern Riverside County.
While some environmental concerns remain, there is consensus that the zones will help shape the nation’s future in solar energy. Federal officials began gathering public input more than a year ago, but a final decision on their size and location is not expected for several months.
Baak said the process has meant uncertainty in the short term but will help advance solar growth in the long run. In the meantime, he and other solar proponents say the public is behind them.
A poll, underwritten by BrightSource to assess community support, found that three-quarters of those surveyed support large-scale solar development in California’s desert.
“It shows that a lot of people support this,” he said. “People recognize that this is a homegrown resource and something that’s going to create new jobs.”
SOURCE: http://www.pe.com/local-news/politics/ben-goad-headlines/20120211-energy-uncertainty-clouds-obamas-latest-solar-push.ece
Labels:
Solar News
Tuesday, February 28, 2012
Chandigarh Set To Be A Model Solar City
As part of the plan to develop Chandigarh into a solar city, UT administration has decided to set up a solar cell, which would provide consultancy to departments for adding features of tapping solar energy in upcoming buildings. The cell will work for the development for renewable energy projects and energy conservation programmes.
The Energy and Resources Institute (TERI) has prepared master action plan for transforming Chandigarh into a solar city. The draft report submitted by TERI has recommended energy efficiency measures of 20% for both residential and commercial sectors.
SOURCE: http://articles.timesofindia.indiatimes.com/2012-01-30/chandigarh/31005331_1_solar-city-solar-energy-solar-cell
The Energy and Resources Institute (TERI) has prepared master action plan for transforming Chandigarh into a solar city. The draft report submitted by TERI has recommended energy efficiency measures of 20% for both residential and commercial sectors.
SOURCE: http://articles.timesofindia.indiatimes.com/2012-01-30/chandigarh/31005331_1_solar-city-solar-energy-solar-cell
Labels:
Solar News
Solar Panels Driving Lively Debate in Scenic Town and Village of Warwick, N.Y.
They appeared about two months ago along the rural road: an eyesore to some, a welcome sign of the future to others.
At issue: two dark, trailer-sized arrays of solar panels set on metal posts along Route 94, the gateway to the Village of Warwick.
Jim and Betty Goodline sat inside Salvato's Deli, about an eighth of a mile down the road from the two solar panel arrays, and discussed the aesthetics.
He described them as "neat";
She used the word "cute."
Did they think policymakers should allow solar panels to be installed anywhere people pleased?
"If it's going to save someone money on their energy bills, the more power to them," Jim said.
Warwick Supervisor Mike Sweeton said there has been more curiosity than controversy about the two solar arrays.
But in an Orange County town touted for leading the county in green energy and sustainability, the solar panels have got a lot of people talking.
According to town officials, the panels and the 200 acres they are located on belong to an elderly woman who bought the land a few months ago with her husband to build a dream home. The husband died, and the widow downsized the construction plans, opting for a smaller house, close to the road and powered by solar. She could not be reached for comment.
Deadlines — possibly for a state grant that helped finance the arrays — required the panels be built first.
The town, which has no ordinance regulating solar or wind turbine installations, allowed it. It would have done the same for a garage or similar structure.
So, the mystery of the two solar arrays was solved. But the debate they fanned about the future of green energy regulations continues.
The actual discussion began last month, when complaints about solar panels on historic homes in downtown Warwick prompted village officials to consider guidelines for their installation. Village trustees said they would likely begin talking about the issue next month.
Then appeared the solar panels on Route 94.
Part of the concern is that they lie within a protected view shed. As such, they will have to be blocked from view, as a condition of the building permit on the house when it is built, Sweeton said.
"They're a horror," said Barbara White, co-owner of the Raynor Country real estate agency downtown. "It's a beautiful, scenic road, and then suddenly to see that!"
White's office colleague, Jeannette Wheeler, had a different view.
"I think they're great," she said. "When I look at them, it cheers me to know that someone is going to save money on their electricity bills and have more control over their lives."
SOURCE: http://www.recordonline.com/apps/pbcs.dll/article?AID=/20120130/NEWS/201300325
At issue: two dark, trailer-sized arrays of solar panels set on metal posts along Route 94, the gateway to the Village of Warwick.
Jim and Betty Goodline sat inside Salvato's Deli, about an eighth of a mile down the road from the two solar panel arrays, and discussed the aesthetics.
He described them as "neat";
She used the word "cute."
Did they think policymakers should allow solar panels to be installed anywhere people pleased?
"If it's going to save someone money on their energy bills, the more power to them," Jim said.
Warwick Supervisor Mike Sweeton said there has been more curiosity than controversy about the two solar arrays.
But in an Orange County town touted for leading the county in green energy and sustainability, the solar panels have got a lot of people talking.
According to town officials, the panels and the 200 acres they are located on belong to an elderly woman who bought the land a few months ago with her husband to build a dream home. The husband died, and the widow downsized the construction plans, opting for a smaller house, close to the road and powered by solar. She could not be reached for comment.
Deadlines — possibly for a state grant that helped finance the arrays — required the panels be built first.
The town, which has no ordinance regulating solar or wind turbine installations, allowed it. It would have done the same for a garage or similar structure.
So, the mystery of the two solar arrays was solved. But the debate they fanned about the future of green energy regulations continues.
The actual discussion began last month, when complaints about solar panels on historic homes in downtown Warwick prompted village officials to consider guidelines for their installation. Village trustees said they would likely begin talking about the issue next month.
Then appeared the solar panels on Route 94.
Part of the concern is that they lie within a protected view shed. As such, they will have to be blocked from view, as a condition of the building permit on the house when it is built, Sweeton said.
"They're a horror," said Barbara White, co-owner of the Raynor Country real estate agency downtown. "It's a beautiful, scenic road, and then suddenly to see that!"
White's office colleague, Jeannette Wheeler, had a different view.
"I think they're great," she said. "When I look at them, it cheers me to know that someone is going to save money on their electricity bills and have more control over their lives."
SOURCE: http://www.recordonline.com/apps/pbcs.dll/article?AID=/20120130/NEWS/201300325
Labels:
Solar News
Ministers Defend Rapid Cut to Solar Power Subsidy
Ministers have argued that they had to act quickly to slash subsidies to small-scale solar power because the cost of panels has dropped by nearly half in the past year – much faster than the previous government envisaged when it set up the scheme.
The government received fierce criticism from the solar industry and environmentalists after the cut and the decision was ruled unlawful in the courts. But ministers have argued that overly generous payments to investors who installed solar panels were in danger of draining the scheme of funds.
They are expected to announce on Thursday a change to the way so-called feed-in tariffs are administered and an injection of funding for the scheme.
Energy minister Greg Barker said the figures on the costs of solar, which he said were independently arrived at, showed the government was right to cut feed-in tariffs. "The costs have come down much faster than Ed Miliband thought in 2010, when the payment was fixed. That has led to much greater deployment," he said.
"We had to take quick action. I know that [the changes to feed-in tariffs] have damaged confidence in the industry. But the new figures speak for themselves."
He said the price falls were good news for consumers and the renewables industry: "There is the potential for solar power to become competitive with fossil fuels without subsidy within the lifetime of this parliament. Solar has gone from being one of the most expensive forms of renewable energy to one of the cheapest."
An average domestic solar power installation cost £15,000 in 2010, but now costs about £8,000. This year the cost could fall to £6,000, according to research from the consultancy Parsons Brinckerhoff, commissioned by the Department of Energy and Climate Change. The report will be placed in the House of Commons library on Wednesday in response to a parliamentary question on the issue.
When the consultation on feed-in tariffs was launched in October, the costs of photovoltaic systems had fallen by about a third since 2009, when the original tariffs were set. The new data confirming sharper falls shows that customers on the original feed-in tariffs could be getting a much higher rate of return than was originally intended – or the solar power companies could be pocketing the difference and making substantial profits.
After the government announced its plans to slash feed-in tariffs last year, judges ruled the measures unlawful when they were challenged in court. On Thursday, Barker is expected to announce how the government will change the feed-in tariffs legally.
Barker is expected to announce that feed-in tariffs will be reformed so that they are gradually ratcheted down as the cost of panels declines, as happens in countries such as Germany. This aims to ensure that the rate of return to people installing the tariffs is kept steady at about 5%, which the government believes will give consumers enough incentive to invest in the panels, and installers enough margin to keep them in business.
But in a nod to the travails of the solar industry, which has suffered months of turmoil, uncertainty and job losses since the cut, the government is expected to announce additional spending on the feed-in tariffs.
Originally, the tariffs were allocated about £860m but this is likely to be increased to about £1bn. The tariffs are paid by additions to energy bills, not from the public purse, but the Treasury has limited the amount that can be spent on them because of fears that bills would rise too fast unless there is a brake.
The extra cash is coming from money that was underspent on larger-scale renewables, such as wind farms.
Solar panels have dropped dramatically in price in part because of massive investment in China, which has built hundreds of solar panel factories, mostly geared at the export market. The price falls have created their own problems, as manufacturers in the developed world have struggled to keep pace and some have gone bust or seen their profits wiped out.
SOURCE: http://www.guardian.co.uk/environment/2012/feb/08/ministers-defend-solar-power-subsidy-cut?newsfeed=true
![]() |
| Solar panels being installed on a house in south-east London |
The government received fierce criticism from the solar industry and environmentalists after the cut and the decision was ruled unlawful in the courts. But ministers have argued that overly generous payments to investors who installed solar panels were in danger of draining the scheme of funds.
They are expected to announce on Thursday a change to the way so-called feed-in tariffs are administered and an injection of funding for the scheme.
Energy minister Greg Barker said the figures on the costs of solar, which he said were independently arrived at, showed the government was right to cut feed-in tariffs. "The costs have come down much faster than Ed Miliband thought in 2010, when the payment was fixed. That has led to much greater deployment," he said.
"We had to take quick action. I know that [the changes to feed-in tariffs] have damaged confidence in the industry. But the new figures speak for themselves."
He said the price falls were good news for consumers and the renewables industry: "There is the potential for solar power to become competitive with fossil fuels without subsidy within the lifetime of this parliament. Solar has gone from being one of the most expensive forms of renewable energy to one of the cheapest."
An average domestic solar power installation cost £15,000 in 2010, but now costs about £8,000. This year the cost could fall to £6,000, according to research from the consultancy Parsons Brinckerhoff, commissioned by the Department of Energy and Climate Change. The report will be placed in the House of Commons library on Wednesday in response to a parliamentary question on the issue.
When the consultation on feed-in tariffs was launched in October, the costs of photovoltaic systems had fallen by about a third since 2009, when the original tariffs were set. The new data confirming sharper falls shows that customers on the original feed-in tariffs could be getting a much higher rate of return than was originally intended – or the solar power companies could be pocketing the difference and making substantial profits.
After the government announced its plans to slash feed-in tariffs last year, judges ruled the measures unlawful when they were challenged in court. On Thursday, Barker is expected to announce how the government will change the feed-in tariffs legally.
Barker is expected to announce that feed-in tariffs will be reformed so that they are gradually ratcheted down as the cost of panels declines, as happens in countries such as Germany. This aims to ensure that the rate of return to people installing the tariffs is kept steady at about 5%, which the government believes will give consumers enough incentive to invest in the panels, and installers enough margin to keep them in business.
But in a nod to the travails of the solar industry, which has suffered months of turmoil, uncertainty and job losses since the cut, the government is expected to announce additional spending on the feed-in tariffs.
Originally, the tariffs were allocated about £860m but this is likely to be increased to about £1bn. The tariffs are paid by additions to energy bills, not from the public purse, but the Treasury has limited the amount that can be spent on them because of fears that bills would rise too fast unless there is a brake.
The extra cash is coming from money that was underspent on larger-scale renewables, such as wind farms.
Solar panels have dropped dramatically in price in part because of massive investment in China, which has built hundreds of solar panel factories, mostly geared at the export market. The price falls have created their own problems, as manufacturers in the developed world have struggled to keep pace and some have gone bust or seen their profits wiped out.
SOURCE: http://www.guardian.co.uk/environment/2012/feb/08/ministers-defend-solar-power-subsidy-cut?newsfeed=true
Labels:
Solar Rebates
Monday, February 27, 2012
County Boasts State's Largest Solar Rooftop
Nearly 23 acres of sun-soaking panels make up the state of North Carolina's largest rooftop solar installation, at least for the present.
Shoe Show Inc.'s $22 million private project sits atop its Cabarrus County distribution facility on Trinity Church Road, near N.C. 73 and I-85.
About 18,500 photovoltaic modules, or solar panels, are estimated to produce about 5 megawatts per year, enough to supply the power needs for more than 600 homes.
The company also installed a $4 million, 750-kilowatt system on its Florence Street building near U.S. 29 in Concord.
Both systems - portions of which have been generating power for months - were created to take advantage of Duke Energy's Renewable Energy Plan, which offers incentives to those who participate in developing renewable energy.
The entire system went online last week. Power collected will be sold to Duke or the city of Concord through a power purchase agreement.
Mooresville-based SunEnergy1, which built the system, said it is the largest rooftop system in the state and one of the largest in the nation. A 20-megawatt solar farm that company is building in Plymouth is larger, but it's on the ground.
Toys "R" Us touts the 5.38-megawatt system being built atop its distribution center in New Jersey as the largest in North America, according to the Charlotte Business Journal.
The solar project Ikea plans in the university area will span 3 acres. Its rooftop will support more than 4,000 solar panels and generate 1.3 megawatts per year, enough to power about 100 homes.
Bob Tucker founded Shoe Show Inc. in Kannapolis in 1960 and has grown the company into the nation's largest independent shoe retailer. It operates 1,123 stores in 37 states and distributes 52 million pairs of shoes per year.
Investing in solar took away from his core businesses of selling shoes, but the benefits outweighed any negative, said Tucker.
"I saw a couple of people who were (investing in solar)," he said. "I knew them and their reputation, and thought if they were doing it, I need to look into it."
Tucker considered renting out the roof to a solar company, then decided against building something to power his facility. Instead, he wanted to build a large-scale system that generates power to sell.
Federal and state tax credits available for solar projects pushed Tucker to move forward.
The federal government allows a project owner to take 30 percent of the project cost as a federal tax credit. N.C. law allows the owner to take 35 percent of costs as a state tax credit.
Tucker said the amount of power the array generates impresses him most.
"It's part of a business, and if it works, it works," said Tucker. "And right now, it's working. What I keep asking is 'How much energy is it producing?' and 'Can you figure out what the real return is going to be?' And we can't really tell until we get three or four months into it."
Tucker said installing the solar array was ultimately a business move, but he's glad it will help the environment. The panels have a 25-year warranty, but their useful life could reach 50 years.
Jack Van Der Poel, Shoe Show's vice president and chief financial officer, said that until now, the push for solar power had never gained momentum, because technology was so expensive and paying for projects only by selling the energy took several years.
"But over the last few years, by having these tax credits, the whole project pays for itself in about five to six years," he said. "If you didn't have those, it would probably take a good 20 years.
"The government realizes (that) in order to get more production from the private sector, they need to put incentives in place to stimulate this, and it has worked," Van Der Poel said. "Everything driving this process was the tax credits and people wanting to take advantage of them."
SOURCE: http://www.charlotteobserver.com/2012/02/08/2982962/county-boasts-states-largest-solar.html
Shoe Show Inc.'s $22 million private project sits atop its Cabarrus County distribution facility on Trinity Church Road, near N.C. 73 and I-85.
About 18,500 photovoltaic modules, or solar panels, are estimated to produce about 5 megawatts per year, enough to supply the power needs for more than 600 homes.
The company also installed a $4 million, 750-kilowatt system on its Florence Street building near U.S. 29 in Concord.
Both systems - portions of which have been generating power for months - were created to take advantage of Duke Energy's Renewable Energy Plan, which offers incentives to those who participate in developing renewable energy.
The entire system went online last week. Power collected will be sold to Duke or the city of Concord through a power purchase agreement.
Mooresville-based SunEnergy1, which built the system, said it is the largest rooftop system in the state and one of the largest in the nation. A 20-megawatt solar farm that company is building in Plymouth is larger, but it's on the ground.
Toys "R" Us touts the 5.38-megawatt system being built atop its distribution center in New Jersey as the largest in North America, according to the Charlotte Business Journal.
The solar project Ikea plans in the university area will span 3 acres. Its rooftop will support more than 4,000 solar panels and generate 1.3 megawatts per year, enough to power about 100 homes.
Bob Tucker founded Shoe Show Inc. in Kannapolis in 1960 and has grown the company into the nation's largest independent shoe retailer. It operates 1,123 stores in 37 states and distributes 52 million pairs of shoes per year.
Investing in solar took away from his core businesses of selling shoes, but the benefits outweighed any negative, said Tucker.
"I saw a couple of people who were (investing in solar)," he said. "I knew them and their reputation, and thought if they were doing it, I need to look into it."
Tucker considered renting out the roof to a solar company, then decided against building something to power his facility. Instead, he wanted to build a large-scale system that generates power to sell.
Federal and state tax credits available for solar projects pushed Tucker to move forward.
The federal government allows a project owner to take 30 percent of the project cost as a federal tax credit. N.C. law allows the owner to take 35 percent of costs as a state tax credit.
Tucker said the amount of power the array generates impresses him most.
"It's part of a business, and if it works, it works," said Tucker. "And right now, it's working. What I keep asking is 'How much energy is it producing?' and 'Can you figure out what the real return is going to be?' And we can't really tell until we get three or four months into it."
Tucker said installing the solar array was ultimately a business move, but he's glad it will help the environment. The panels have a 25-year warranty, but their useful life could reach 50 years.
Jack Van Der Poel, Shoe Show's vice president and chief financial officer, said that until now, the push for solar power had never gained momentum, because technology was so expensive and paying for projects only by selling the energy took several years.
"But over the last few years, by having these tax credits, the whole project pays for itself in about five to six years," he said. "If you didn't have those, it would probably take a good 20 years.
"The government realizes (that) in order to get more production from the private sector, they need to put incentives in place to stimulate this, and it has worked," Van Der Poel said. "Everything driving this process was the tax credits and people wanting to take advantage of them."
SOURCE: http://www.charlotteobserver.com/2012/02/08/2982962/county-boasts-states-largest-solar.html
Labels:
Solar News
Solar Tulip Targets Facebook Generation With Designer Power
Aora Solar Ltd. is aiming to win clients from the “Facebook generation” with community-scale generators that double as giant sculptures, according to the designer of its tulip-shaped solar towers.
The facilities, which use a combination of mirrors and fuels such as natural gas or biomass to generate 100 kilowatts of power, combine style and function to persuade design- conscious consumers to erect generators close to their homes, Haim Dotan said at the inauguration of the company’s second plant.
“This project should be put on Facebook so all the children of the world can see it, not only in professional magazines,” said Dotan, who also designed Israel’s pavilion at the 2010 World Expo in Shanghai. “Beauty doesn’t mean that it’s more expensive. It’s down to fun and hard work.”
Aora this month began feeding power to the grid from its second prototype plant in Almeria, southern Spain, and aims to install about 50 of generators this year, Chief Executive Officer Zev Rosenzweig said. He’s seeking to raise $35 million to $40 million of new capital so that he can build several hundred generators in 2013.
The micro solar-thermal plants generate about 100 kilowatts of power and cost about $550,000 each. They’re designed to allow developers to build up capacity slowly without the project loans needed by the biggest solar plants.
‘Many Orders’
“I need the working capital to grow explosively,” he said in an interview at the site of the Almeria plant. “If you’re putting up 200 megawatts of concentrating solar power, you need to find someone who’s going to trust you with a billion dollars and that’s a declining demographic. I believe I will receive many, many orders in next nine months.”
The solar tulip’s combination of solar and combustion- fueled generation means it can guarantee to supply power 24 hours a day with its computer software blending the two energy sources as the weather conditions fluctuate. The cost of power from a solar tulip “compares very favorably” with any other solar-thermal project that has been announced, Rosenzweig said.
The plants use an array of 50 computer-controlled mirrors to focus the sun’s rays on a receptor atop a 35-meter tower, which heats compressed air to 1,000 degrees centigrade and powers a turbine. By using air rather than the steam turbines most other solar-thermal plants have, Aora reduces the plant’s water consumption to less than 230 liters a megawatt-hour compared with 3,000 liters for a steam plant, Rosenzweig said.
Sun and Water
“This was developed for use in desert environments where you have the most sun and the least water,” Rosenzweig said.
The plant in Almeria, the only desert in continental Europe, uses water for washing the mirrors and for cooling the air sucked into the compressor when the atmospheric temperature breaches 35 degrees centigrade.
Aora’s strategy contrasts with the approach of rival solar- thermal developers such as BrightSource Energy Inc. and Seville- based Abengoa SA that have been building ever larger plants in southern Spain and the southwestern U.S. in a bid to drive down the cost of equipment. BrightSource is building the world’s largest solar power plant, a 392-megawatt generating complex at Ivanpah in California.
“I gain efficiencies by building a small, simple plant over and over again,” Rosenzeweig said.
The solar tulip can match the power of a utility-scale plant like BrightSource’s by building 100 or more units together. Dotan, a former construction worker with offices in Tel Aviv and Shanghai, imagines the towers painted in different colors stretching out across the desert floor.
Deserts as Gardens
“Deserts are beautiful, but we want to turn them into gardens,” he said. “The sun is going to make the desert bloom.”
Aora, based in Rehovot, Israel, was spun off by EDIG Industries last year and is majority owned by the CPC investment fund. EDIG retains a 17.5 percent stake.
Rosenzweig said the technology can supply power to small communities or business or directly to power companies. Aora is in talks with an architect in California who wants to build one $555,000 plant as the power source for a 60-home development that will be independent of the power grid.
A dairy cooperative in Spain is considering building a tulip and using its excess heat for pasteurizing milk and, through a technique called absorption chilling, to cool the processed milk while producing biogas for the burner from its cow dung.
“It’s a closed loop,” Rosenzweig said. “Anything that comes out of the cow goes back” into the cycle.
Still, Rosenzweig, who previously worked in the nuclear power and defense industries, isn’t relying on the generation that has grown up with Facebook, the largest social network, to deliver his business plan.
“It’ll take about 10 years to catch on with them,” he said.
SOURCE: http://www.businessweek.com/news/2012-02-08/solar-tulip-targets-facebook-generation-with-designer-power.html
The facilities, which use a combination of mirrors and fuels such as natural gas or biomass to generate 100 kilowatts of power, combine style and function to persuade design- conscious consumers to erect generators close to their homes, Haim Dotan said at the inauguration of the company’s second plant.
“This project should be put on Facebook so all the children of the world can see it, not only in professional magazines,” said Dotan, who also designed Israel’s pavilion at the 2010 World Expo in Shanghai. “Beauty doesn’t mean that it’s more expensive. It’s down to fun and hard work.”
Aora this month began feeding power to the grid from its second prototype plant in Almeria, southern Spain, and aims to install about 50 of generators this year, Chief Executive Officer Zev Rosenzweig said. He’s seeking to raise $35 million to $40 million of new capital so that he can build several hundred generators in 2013.
The micro solar-thermal plants generate about 100 kilowatts of power and cost about $550,000 each. They’re designed to allow developers to build up capacity slowly without the project loans needed by the biggest solar plants.
‘Many Orders’
“I need the working capital to grow explosively,” he said in an interview at the site of the Almeria plant. “If you’re putting up 200 megawatts of concentrating solar power, you need to find someone who’s going to trust you with a billion dollars and that’s a declining demographic. I believe I will receive many, many orders in next nine months.”
The solar tulip’s combination of solar and combustion- fueled generation means it can guarantee to supply power 24 hours a day with its computer software blending the two energy sources as the weather conditions fluctuate. The cost of power from a solar tulip “compares very favorably” with any other solar-thermal project that has been announced, Rosenzweig said.
The plants use an array of 50 computer-controlled mirrors to focus the sun’s rays on a receptor atop a 35-meter tower, which heats compressed air to 1,000 degrees centigrade and powers a turbine. By using air rather than the steam turbines most other solar-thermal plants have, Aora reduces the plant’s water consumption to less than 230 liters a megawatt-hour compared with 3,000 liters for a steam plant, Rosenzweig said.
Sun and Water
“This was developed for use in desert environments where you have the most sun and the least water,” Rosenzweig said.
The plant in Almeria, the only desert in continental Europe, uses water for washing the mirrors and for cooling the air sucked into the compressor when the atmospheric temperature breaches 35 degrees centigrade.
Aora’s strategy contrasts with the approach of rival solar- thermal developers such as BrightSource Energy Inc. and Seville- based Abengoa SA that have been building ever larger plants in southern Spain and the southwestern U.S. in a bid to drive down the cost of equipment. BrightSource is building the world’s largest solar power plant, a 392-megawatt generating complex at Ivanpah in California.
“I gain efficiencies by building a small, simple plant over and over again,” Rosenzeweig said.
The solar tulip can match the power of a utility-scale plant like BrightSource’s by building 100 or more units together. Dotan, a former construction worker with offices in Tel Aviv and Shanghai, imagines the towers painted in different colors stretching out across the desert floor.
Deserts as Gardens
“Deserts are beautiful, but we want to turn them into gardens,” he said. “The sun is going to make the desert bloom.”
Aora, based in Rehovot, Israel, was spun off by EDIG Industries last year and is majority owned by the CPC investment fund. EDIG retains a 17.5 percent stake.
Rosenzweig said the technology can supply power to small communities or business or directly to power companies. Aora is in talks with an architect in California who wants to build one $555,000 plant as the power source for a 60-home development that will be independent of the power grid.
A dairy cooperative in Spain is considering building a tulip and using its excess heat for pasteurizing milk and, through a technique called absorption chilling, to cool the processed milk while producing biogas for the burner from its cow dung.
“It’s a closed loop,” Rosenzweig said. “Anything that comes out of the cow goes back” into the cycle.
Still, Rosenzweig, who previously worked in the nuclear power and defense industries, isn’t relying on the generation that has grown up with Facebook, the largest social network, to deliver his business plan.
“It’ll take about 10 years to catch on with them,” he said.
SOURCE: http://www.businessweek.com/news/2012-02-08/solar-tulip-targets-facebook-generation-with-designer-power.html
Labels:
Solar News
Solar Start-ups Set New Efficiency Records
Although Alta Devices and Semprius make different types of solar panels, both start-ups have been breaking records in the past few days. Santa Clara, Calif.-based Alta Devices announced that its solar panels have achieved an efficiency of 23.5%, which has been verified by the National Renewable Energy Laboratory (NREL) as the highest solar panel efficiency to date. And Semprius, based in Durham, North Carolina, has announced that its concentrated solar panels have achieved an efficiency of 33.9%. Unlike traditional solar panels, concentrated solar panels use lenses to concentrate sunlight at intensities of up to 1,000 suns.
In addition to breaking records, another thing these two types of solar panels have in common is that they’re both made of gallium arsenide (GaAs) instead of the more conventional silicon. Although GaAs is more expensive than silicon, it’s much better at absorbing sunlight. To keep costs down, both companies have developed designs that use minimal amounts of the material.
Alta has developed a manufacturing technique that fabricates solar cells about 1 micron thick, which is a fraction of the thickness of other GaAs solar cells. For comparison, the company notes that a human hair is approximately 40 microns thick. In addition to being extremely thin, the solar cells are also flexible, offering the potential to be integrated into roof and building materials, transportation products, and other devices. Last summer, Alta demonstrated that one of these solar cells could achieve an efficiency of 27.6% (some efficiency is lost when multiple cells are wired together and assembled into an entire solar panel).
Alta’s goal is to make solar panels that are cost-competitive with fossil fuels, and to do so without government subsidies. The company is pursuing the Department of Energy’s (DOE) SunShot initiative, which aims to bring solar-generated electricity down to six cents per kilowatt-hour by the end of the decade, making it competitive with coal and natural gas. The DOE predicts that, if this goal is met, solar panels would account for 15-18% of US electricity generation by 2030, up from less than 1% today.
As for Semprius’ strategy, the company’s concentrated solar panels consist of thousands of GaAs microcells the size of a pencil point that Semprius claims are the world’s smallest solar cells. The microcells are robotically stamped onto a substrate using a specialized micro-transfer printing process. The panels contain three layers of the microcells, each modified to convert a different part of the solar spectrum into electricity.
Semprius’ 33.9% efficiency, which was verified by third parties, smashes the previous record of 32.0% for high-concentration photovoltaic (HCPV) solar panels. Further, the panel is not a prototype, but is intended for commercial use. Semprius plans to open a factory in Henderson, North Carolina, this summer and to start manufacturing commercial solar panels later this year. Like Alta, the company also predicts it can eventually generate electricity at a cost competitive with fossil fuels, also without government subsidies.
SOURCE: http://www.physorg.com/news/2012-02-solar-start-ups-efficiency.html
In addition to breaking records, another thing these two types of solar panels have in common is that they’re both made of gallium arsenide (GaAs) instead of the more conventional silicon. Although GaAs is more expensive than silicon, it’s much better at absorbing sunlight. To keep costs down, both companies have developed designs that use minimal amounts of the material.
Alta has developed a manufacturing technique that fabricates solar cells about 1 micron thick, which is a fraction of the thickness of other GaAs solar cells. For comparison, the company notes that a human hair is approximately 40 microns thick. In addition to being extremely thin, the solar cells are also flexible, offering the potential to be integrated into roof and building materials, transportation products, and other devices. Last summer, Alta demonstrated that one of these solar cells could achieve an efficiency of 27.6% (some efficiency is lost when multiple cells are wired together and assembled into an entire solar panel).
Alta’s goal is to make solar panels that are cost-competitive with fossil fuels, and to do so without government subsidies. The company is pursuing the Department of Energy’s (DOE) SunShot initiative, which aims to bring solar-generated electricity down to six cents per kilowatt-hour by the end of the decade, making it competitive with coal and natural gas. The DOE predicts that, if this goal is met, solar panels would account for 15-18% of US electricity generation by 2030, up from less than 1% today.
As for Semprius’ strategy, the company’s concentrated solar panels consist of thousands of GaAs microcells the size of a pencil point that Semprius claims are the world’s smallest solar cells. The microcells are robotically stamped onto a substrate using a specialized micro-transfer printing process. The panels contain three layers of the microcells, each modified to convert a different part of the solar spectrum into electricity.
Semprius’ 33.9% efficiency, which was verified by third parties, smashes the previous record of 32.0% for high-concentration photovoltaic (HCPV) solar panels. Further, the panel is not a prototype, but is intended for commercial use. Semprius plans to open a factory in Henderson, North Carolina, this summer and to start manufacturing commercial solar panels later this year. Like Alta, the company also predicts it can eventually generate electricity at a cost competitive with fossil fuels, also without government subsidies.
SOURCE: http://www.physorg.com/news/2012-02-solar-start-ups-efficiency.html
Labels:
Solar News
Subscribe to:
Posts (Atom)













